Show simple item record

dc.contributor.authorMwanga, Joshua
dc.contributor.authorTenywa, Brian Humphrey
dc.date.accessioned2019-09-16T08:43:20Z
dc.date.available2019-09-16T08:43:20Z
dc.date.issued2019-05
dc.identifier.urihttp://hdl.handle.net/20.500.12281/6471
dc.descriptionThis Report is Submitted in Partial Fulfilment of the Requirements for the Award of a Degree of Bachelor of Science in Civil Engineeringen_US
dc.description.abstractThe semliki catchment basin model (32674.8km2) was delineated using HEC GeoHMS in ArcGIS 10.4.1 environment. Hydrological modeling was done using HEC HMS 4.2.1 software in which control specifications were defined and in the meteorological model, design storm parameters such as 25, 50 and 100-year design storms were input that generated design flood discharges of 249.9, 604.4 and 1167.6 m3/s respectively. Hydraulic modeling was carried out using HEC RAS 5.0.5 software that yielded flood inundation depth at the Bweramule of 2.202m, 4.171m and 4.861m for the simulated 25, 50 and 100-year return period floods respectively. Flood hazard maps developed for each flood event showing the extent of the flood prone areas using the RAS mapper. Then flood plain management programme was developed on the proper use of the flood plain to minimize on the damage caused by the floods.en_US
dc.language.isoenen_US
dc.publisherMakerere Universityen_US
dc.subjectSemilikien_US
dc.subjectHydrologicalen_US
dc.subjectFlooden_US
dc.titleFlood hazard assessment of river semliki catchment in ntoroko district, Ugandaen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record