Assessment of an optimum location for an 8 MW thermal power plant for the West Nile grid
(Makerere University, 2019-06)
West Nile is composed of districts that include Adjumani, Arua, Koboko, Maracha, Moyo,
Nebbi, Yumbe and Zombo. It is the only region in Uganda that is not fully connected to
the national grid, it is supplied by the Nyagak ...
Strategy to quantify and minimize energy losses on distribution networks.
(Makerere University, 2019-06)
High energy losses occur during the distribution of electricity to the end user in Uganda.
These are both technical and non-technical losses. The purpose of this study was to
develop an action plan to quantify, investigate ...
Design and implementation of an electricity monitoring and control system based on AC power line carriers
(Makerere University, 2019-07)
According to Umeme, the current prepayment system (YAKA) allows customers to conveniently manage and control their electricity; however, this is true only to a small degree in reality as the information provided by YAKA ...
Real time monitoring of a prepaid meter
(Makerere University, 2019-06)
The Real Time Monitoring System and Notificatication Platform for prepaid meter
(yaka meter) allows detection of meter tempering,identifies customers on direct
supply and also ascertains the customer power consumption ...
Modelling and analysis of off grid distribution networks for improved reliability performance. Case study: West Nile
(Makerere University, 2019-06)
A major requirement on electricity supply systems is to ensure high supply reliability for the customers. West Nile is isolated from the main grid and WENRECO is the Distribution company responsible for supply of electricity ...